    story #10670 a BurnUp chart based on Done stories
Summary
Empty
a BurnUp chart based on Done stories

I can track development effort vs. budget

BurnUp will be a new field of an artifact (like burndown) with 3 fields to configure:

  • start_date: when to start computation
  • duration: how long should it last
  • capacity: how much effort is targeted (for ideal burn-up line)

Difference with burndown:

  • Rendering is done with D3js lib (instead of EOL jpgraph)
    • REST route /artifacts/:id (or equivalent) must return the values
    • Need to implement the rendering with the new lib. We cannot re-use directly what's already present for agile dashboard home page because it lacks of
      • abscissa and ordinates legend
      • abscissa scale (days)
      • labels for each line
    • Rendering must use the same style (colors, fonts…) as the Kanban's cumulative flow chart
  • Computation is done like:
    • The elements linked to the current artifact
    • Within this list, only artifacts that are declared "Done" (story #10631) are taken into account
    • For those items, we sum the value of the field declared in "initial_effort" semantic

Things that's need to be verified / sorted-out during implementation:

  • What about several burn-up fields on 1 artifact (with different target_fields tought). Verify it's possible and it doesn't mess the global computation. If it's not easly possible, ensure it's not possible to configure 2 burn-up fields.
  • Ensure fixes made for Timezone handling on burndown are present

Things to test:

  • Verify behaviour with a burndown and a burn-up field
  • Verify that deletion of field (tracker, project) means no longer any computation for this field

New field check list:

  • Tracker Field Structure
    • Specific properties
      • Yes configuration based on other fields TBC...
    • Field can be switch to another type (only sb/msb)
      • No
    • Shared Fields
      • No
    • Import/Export XML
      • Yes
    • Field is duplicated on tracker inheritance (both tracker and project creation)
      • Yes
    • Definition is NOT given through SOAP @deprecated
      • Correct  
    • Definition is given through REST (representations)
      • Yes
    • Migrate field from TV3 (if not done)
      • No
    • Does new field can be used for burndown?
      • No
    • Can the field be required
      • No
  • Artifacts
    • Export/import CSV
      • No
    • What does ‘None’ mean for this field?
      • No
    • Default value
      • No
    • Field is involved in notifications
      • Yes (<img src="">)
    • New value is sent in notifications
      • See notif
    • Diff of the field appears in changesets
      • No
    • Get/create/update NOT through SOAP @deprecated
      • Correct
    • New value is Copyed on Artifact copy
      • No
    • New value can be used in semantic
      • No
    • New value can be updated on masschanges
      • No
    • On an artifact with artifact links, on creating directly a child the field can be used
      • No
  • Reports
    • Field is searchable through criteria
      • No
    • Field is displayed as a column in table
      • No
    • Field is used to sort
      • No
    • Field is used for aggregates
      • No
    • Field is used to build charts
      • No
    • Field is used to build cardwall
      • No
  • Angular
    • Create/ edit modal
      • No
    • Cardwall edit in place
      • No
    • Card field in planning v2
      • No
    • Card field in kanban + filter + highlight
      • No
    • Does field can be directly updated in Cardwall
      • No
    • Modal edit Release
      • No
    • Modal add a Task
      • No
  • User documentation is accurate
    • Yes

Technical points:

  • System event for daily burndown computation can be re-used to add the burn-up computation
  • A new system event is needed to re-compute 1 burn-up in case of error
Empty
Empty
Status
Empty
Done
Development
  • [ ] Does it involves User Interface? 
  • [ ] Are there any mockups?
  • [ ] Are permissions checked?
  • [ ] Does it need Javascript development?
  • [ ] Does it need a forge upgrade bucket?
  • [ ] Does it need to execute things in system events?
  • [ ] Does it impact project creation (templates)?
  • [ ] Is it exploratory?
Empty
Details
#10670
Manuel Vacelet (vaceletm)
2018-01-19 09:53
2017-09-20 14:35
3293

References

Follow-ups

User avatar
Thomas Gerbet (tgerbet)2017-12-28 08:51
A "Force cache regeneration" button might still be useful if the semantic initial effort or done have been modified somewhere in the hierarchy of the burnup artifacts. Users might not want to have their burnups completely changed every-time someone change something in another tracker. The button to refresh the burnup is probably enough for this case.

  • Acceptance criteria
    Something went wrong, the follow up content couldn't be loaded
    Only formatting have been changed, you should switch to markup to see the changes
User avatar
  • Acceptance criteria
    Something went wrong, the follow up content couldn't be loaded
    Only formatting have been changed, you should switch to markup to see the changes
User avatar
  • I want to
    -a BurnUp chart based on actual effort 
    +a BurnUp chart based on Done stories 
  • So that
    Something went wrong, the follow up content couldn't be loaded
    Only formatting have been changed, you should switch to markup to see the changes
  • Acceptance criteria
    Something went wrong, the follow up content couldn't be loaded
    Only formatting have been changed, you should switch to markup to see the changes
  • Permissions set to