    story #14885 Display “Other tests”
Summary
Empty
Display “Other tests”
Empty
  • Enforcement of "covered_by"

    • How tests are added to “Other tests” ?

      • When someone adds a link to Test Definition from a Milestone artifact with “covered by” nature

        • Eg. In “Release 1.0”, I add “Ensure page is loaded” test with “covered_by” nature.

      • When, in a campaign associated with a Milestone, an existing Test, not already linked to a Backlog Item of this milestone is added.

        • Eg. In “Release 1.0”, I created “Validation RC1” campaign.

        • In “Validation RC1” campaign, I select “Load test with 100 users”. This test is not linked with a story of “Release 1.0”

        • Then “Load test with 100 users” is added to the campaign

        • And “Load test with 100 users” is linked to “Release 1.0” with “covered_by” nature

      • Extension of previous point: it also works when one creates a new test directly in the campaign.

    • When an “Other test” is linked to a Backlog Item of a Milestone, the link between Milestone and test is removed

      • Given “Load test with 100 users” was added to “Other tests”

      • When I link “Load test with 100 users” to “Fix performance issue” bug of “Release 1.0”

      • Then “Load test with 100 users” is removed from “Release 1.0” linked tests.

      • And “Load test with 100 users” is no longer displayed in “Other tests”

    • Places where we need to check the link consistencies and update/create links
      • Create new “test_execution” route (from a campaign, when associated with a Milestone)

      • When a Backlog Item has a new link “covered_by” (regardless of the source)

        • Need to check when Backlog Item is present in several Milestones

    • When a test, not attached to any Backlog Items, is removed from the last campaign, it must be removed from the “Other tests” as well.

  • Management of display:

    • “Other tests” lists Test Definitions that are linked by the milestone with “covered_by” nature

    • Need new REST route to get all tests that covers a milestone

    • Creation of a new campaign from “Milestone tests” should also take “Other tests”

Empty
Empty
Status
Empty
Canceled
Development
  • [ ] Does it involves User Interface? 
  • [ ] Are there any mockups?
  • [ ] Are permissions checked?
  • [ ] Does it need Javascript development?
  • [ ] Does it need a forge upgrade bucket?
  • [ ] Does it need to execute things in system events?
  • [ ] Does it impact project creation (templates)?
  • [ ] Is it exploratory?
Empty
Details
#14885
Manuel Vacelet (vaceletm)
2022-05-09 16:25
2020-05-13 15:11
3910

References
Referencing story #14885

Artifact Tracker v5

epic #14871 Test Plan v1

Follow-ups

User avatar

Not part of test plan ATM


  • Status changed from Ready (stalled) to Canceled
  • Category set to
User avatar
  • Acceptance criteria
    Something went wrong, the follow up content couldn't be loaded
    Only formatting have been changed, you should switch to markup to see the changes